A) There is no difference - they both refer to the same concept.
B) Delays are planned activities; storages are not.
C) Delays are uncontrolled; storage is a planned part of a process.
D) Delays require control; storages does not.
Correct Answer
verified
Multiple Choice
A) Increased storage requirements
B) Quality issues
C) Increased labor costs
D) All of these
Correct Answer
verified
Multiple Choice
A) Activities
B) Inputs/Outputs/Flows
C) Process Structure
D) Management Policies.
Correct Answer
verified
Multiple Choice
A) Delay
B) Operation
C) Reporting
D) Storage
Correct Answer
verified
Multiple Choice
A) Decrease utilization.
B) Increase the coefficient of variation of job arrival times.
C) Increase the coefficient of variation of job processing times.
D) None of these would decrease waiting time.
Correct Answer
verified
Multiple Choice
A) Inputs,outputs,and flows.
B) Activities.
C) Management metrics.
D) Structure.
Correct Answer
verified
Multiple Choice
A) Competitors are improving their processes.
B) Customer preferences change over time.
C) Technology is constantly changing.
D) All of these.
Correct Answer
verified
Multiple Choice
A) Step 1
B) Step 2
C) Step 3
D) Step 4
Correct Answer
verified
Multiple Choice
A) 15 percent
B) 50 percent
C) 85 percent
D) 100 percent
Correct Answer
verified
Multiple Choice
A) Flow time
B) Cycle time
C) Throughput time
D) Wait time
Correct Answer
verified
Multiple Choice
A) Utilization is 60 percent of maximum capacity.
B) Yield is 133 percent of effective capacity.
C) Utilization was 133 percent of effective capacity.
D) All of these are true.
Correct Answer
verified
Multiple Choice
A) Short-term
B) Medium-term
C) Long-term
D) It is not part of the capacity planning process.
Correct Answer
verified
Multiple Choice
A) One reason economies of scale occur is because fixed costs can be spread over more units of production as output increases.
B) One reason economies of scale occur is because employees become more efficient as volume increases.
C) Economies of scale refers to the fact that as volume increases,total cost of production decreases.
D) Economies of scale may not exist at all levels of production.
Correct Answer
verified
Multiple Choice
A) The smallest number of resources devoted to it.
B) The least capacity.
C) No delays in front of it.
D) The highest cost.
Correct Answer
verified
Multiple Choice
A) If you don't like the outcome,focus on the people.
B) Processes are guidelines to thinking about to best staff activities.
C) Processes drive measurement.
D) If you don't like the outcome,change the process.
Correct Answer
verified
Multiple Choice
A) Effective capacity.
B) Yield rate.
C) Utilization.
D) Maximum capacity.
Correct Answer
verified
Multiple Choice
A) Operation
B) Delay
C) Storage
D) You are not in a process activity.
Correct Answer
verified
Multiple Choice
A) Increasing capacity through physical additions.
B) Outsourcing.
C) Managing the flow of work into the system.
D) Changing the processes to eliminate unnecessary steps.
Correct Answer
verified
Multiple Choice
A) Increase in costs and increase in defects.
B) Increase in output and increase in lead-times.
C) Decrease in inspections and increase in costs.
D) Decrease in output and increase in lead-times.
Correct Answer
verified
Multiple Choice
A) Activities
B) Inputs/outputs/flows
C) Process structure
D) Management policies
Correct Answer
verified