Which of the following statements best differentiates a delay from storage?


A) There is no difference - they both refer to the same concept.
B) Delays are planned activities; storages are not.
C) Delays are uncontrolled; storage is a planned part of a process.
D) Delays require control; storages does not.

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Inventory held due to bottlenecks in a process causes:


A) Increased storage requirements
B) Quality issues
C) Increased labor costs
D) All of these

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Which of the following elements of a process most directly impacts or affects process capabilities?


A) Activities
B) Inputs/Outputs/Flows
C) Process Structure
D) Management Policies.

E) None of the above
F) B) and D)

Correct Answer

verifed

verified

C

Which of the following is NOT a basic activity type in processes?


A) Delay
B) Operation
C) Reporting
D) Storage

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

Suppose you learn that a process has a very long waiting time.Which of the following would decrease the waiting time?


A) Decrease utilization.
B) Increase the coefficient of variation of job arrival times.
C) Increase the coefficient of variation of job processing times.
D) None of these would decrease waiting time.

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

A manager is currently unhappy with the capabilities of a particular process and wants to improve its capabilities.To accomplish this,the manager needs to focus on the process:


A) Inputs,outputs,and flows.
B) Activities.
C) Management metrics.
D) Structure.

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

D

Continual improvement of processes is important because:


A) Competitors are improving their processes.
B) Customer preferences change over time.
C) Technology is constantly changing.
D) All of these.

E) C) and D)
F) A) and D)

Correct Answer

verifed

verified

The following sequence shows four operations for a computer chip assembly process and the effective capacity of each.Which step is the bottleneck? Step 1: 500 chips/hour Step 2: 250 chips/hour Step 3: 200 chips/hour Step 4: 550 chips/hour


A) Step 1
B) Step 2
C) Step 3
D) Step 4

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

Under Juran's Law,whenever a problem occurs,what percentage of the time is the problem the result of a system/process error?


A) 15 percent
B) 50 percent
C) 85 percent
D) 100 percent

E) B) and C)
F) A) and C)

Correct Answer

verifed

verified

The total time that it takes to get one unit through a process is called:


A) Flow time
B) Cycle time
C) Throughput time
D) Wait time

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Adam Smith described his company's process as follows: "Under ideal conditions we can produce 10,000 units a day.However,our normal production is 6,000 units a day.Today,we actually produced 8,000 units." Which of the following is true?


A) Utilization is 60 percent of maximum capacity.
B) Yield is 133 percent of effective capacity.
C) Utilization was 133 percent of effective capacity.
D) All of these are true.

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

Subcontracting is typically considered at what time horizon when doing capacity planning?


A) Short-term
B) Medium-term
C) Long-term
D) It is not part of the capacity planning process.

E) All of the above
F) None of the above

Correct Answer

verifed

verified

B

Which of the following statements about economies of scale is NOT true?


A) One reason economies of scale occur is because fixed costs can be spread over more units of production as output increases.
B) One reason economies of scale occur is because employees become more efficient as volume increases.
C) Economies of scale refers to the fact that as volume increases,total cost of production decreases.
D) Economies of scale may not exist at all levels of production.

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

A bottleneck activity in a process is generally the activity with:


A) The smallest number of resources devoted to it.
B) The least capacity.
C) No delays in front of it.
D) The highest cost.

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Process thinking causes managers to address critical process elements,including:


A) If you don't like the outcome,focus on the people.
B) Processes are guidelines to thinking about to best staff activities.
C) Processes drive measurement.
D) If you don't like the outcome,change the process.

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

Joe Jones,plant manager at Waco Industries,told a friend that if it was necessary,his plant could produce 1,000 items a day if all conditions were just right.Joe is describing his plant's:


A) Effective capacity.
B) Yield rate.
C) Utilization.
D) Maximum capacity.

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

You walk into a hair stylist shop.All stylists are busy and you sit in the waiting area.You are in which of the following basic activity types in a process?


A) Operation
B) Delay
C) Storage
D) You are not in a process activity.

E) B) and C)
F) C) and D)

Correct Answer

verifed

verified

Which of the following actions will NOT increase output?


A) Increasing capacity through physical additions.
B) Outsourcing.
C) Managing the flow of work into the system.
D) Changing the processes to eliminate unnecessary steps.

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Which two of the following effects directly result from bottlenecks?


A) Increase in costs and increase in defects.
B) Increase in output and increase in lead-times.
C) Decrease in inspections and increase in costs.
D) Decrease in output and increase in lead-times.

E) C) and D)
F) B) and C)

Correct Answer

verifed

verified

Floor space used to store items to be inspected belongs to which of the following elements of a process?


A) Activities
B) Inputs/outputs/flows
C) Process structure
D) Management policies

E) None of the above
F) B) and D)

Correct Answer

verifed

verified